Project Portfolio

A selection of projects for manufacturing companies. Focused on SolidWorks automation, parametric design, and production-ready output.

Contact us for a short technical conversation. In a short contact, we typically identify where the fastest time savings are.

Vehicle concept
Challenge
Quotations and BOMs were compiled manually, which took time and introduced errors.
Solution
A parametric vehicle concept with an automated library and BOM generation.
Result
Faster quotation work. Fewer errors. Direct, order-ready output.
Driveshaft configurator
Challenge
Selecting the correct driveshaft manually was slow and error-prone.
Solution
A configurator that calculates type and quantity automatically based on user input.
Result
Faster engineering. Correct selection every time.
Parametric conveyor design
Challenge
Building each conveyor from scratch consumed significant engineering time.
Solution
A parametric design driven by a master sketch.
Result
Changes in seconds. Major time savings.
Tank simulation
Challenge
Overdesign and too many physical prototypes.
Solution
Simulation and strength validation in SolidWorks.
Result
Less material. Fewer tests. Lower cost.
Mudguard product configurator
Challenge
Creating and exporting variants manually took a lot of time.
Solution
A product configurator with automatic drawings and exports.
Result
Shorter lead times. Consistent production data.
Piping structure
Challenge
Large piping installations were hard to modify and difficult to manage.
Solution
A room-based structure driven by global master sketches.
Result
Faster changes. Better overview. Fewer errors during revisions.
CIP tanks
Challenge
Limited space caused installation issues and rework.
Solution
A layout validated for fit, access, and space claims.
Result
Fewer surprises on site. Faster installation.
Tail lift library part
Challenge
Rebuilding variants repeatedly resulted in duplicated effort.
Solution
A parametric library part with well-defined design rules.
Result
Reuse. Faster engineering. Consistent output.
Motion and interference check
Challenge
Collisions and motion issues were often discovered too late.
Solution
Motion and interference validation in 3D.
Result
Issues detected earlier. Fewer late-stage corrections.
Safety guarding
Challenge
Repetitive drafting for safety guarding consumed a lot of time.
Solution
Automated generation using Weldments and driving sketches.
Result
Significant time savings. Fewer drawing errors. Consistent parts.
ERP integration for greenhouse construction
Challenge
Manually transferring data to ERP caused errors and delays.
Solution
Automated integration via SolidWorks custom properties.
Result
Less duplicate work. Reliable data. Faster order processing.
Sheet optimization
Challenge
Unnecessary scrap due to suboptimal sheet selection.
Solution
Design aligned with available sheet sizes.
Result
Less waste. Lower cost. Better preparation for production.
Parametric cranes
Challenge
New variants required extensive modelling every time.
Solution
Parametric cranes with inputs for dimensions and options.
Result
Faster variant quoting. Fewer engineering hours per quotation.
FEA crane arm
Challenge
Overdesign risk or uncertainty about plate thickness.
Solution
Strength analysis and stress validation on critical zones.
Result
Correct sizing. Cost reduction. Lower risk.
Flat patterns driven by volume targets
Challenge
Manual calculations and flat pattern work took time and introduced errors.
Solution
Volume targets drive the geometry and sheet metal development automatically.
Result
Production-ready flat patterns immediately. Less rework.
Volume calculations
Challenge
Uncertainty about volume and dimensions across variants.
Solution
Fast volume calculations linked directly to model parameters.
Result
Immediate insight. Faster design decisions.
Sheet metal hoppers
Challenge
Manually verifying sheet metal flat patterns took time.
Solution
Automated sheet metal build-up with correct flat patterns.
Result
Fewer cutting and bending errors. Reliable production output.
Hose rack generator
Challenge
Hose racks were modelled manually for each variant.
Solution
Automatic generation based on parameters.
Result
Faster standardization. Fewer engineering hours.
Hose rack variants
Challenge
Large numbers of copied models became difficult to maintain.
Solution
A variant system built from a single base design.
Result
Less maintenance. Fewer errors. Faster updates.
Ladder truck visualization
Challenge
Fully modelling everything in 3D for a concept phase took too long.
Solution
Visualization using photos on the design where full detail was not required.
Result
Faster communication. Less modelling work in early phases.
Off-road vehicle
Challenge
Packaging and operating context needed to be evaluated quickly.
Solution
An off-road vehicle concept with rapid studies and variants.
Result
Faster decisions. Lower risk of choosing the wrong direction.
Winch cross-section
Challenge
A complex drive train is hard to assess without clear insight.
Solution
A cross-section showing planetary drive systems for analysis and communication.
Result
Clearer understanding. Fewer errors during assembly and maintenance.
Fixture in use
Challenge
Explaining operation without clear visuals led to misunderstandings.
Solution
Models and scenes for instructions and training.
Result
Faster comprehension. Fewer assembly and usage mistakes.
Stairs and handrails
Challenge
Laying out rails and posts manually was error-prone.
Solution
Automatic generation driven by a master sketch and rules.
Result
Correct quantities. Fewer measurement errors on site. Faster changes.
Properties export and validation
Challenge
Inconsistent or incomplete properties caused errors in ERP/PDM.
Solution
Automatic file metadata export to a database with visual validation.
Result
Consistent data. Less correction work. More control.
Truss export
Challenge
Adjusting and exporting trusses manually was slow.
Solution
Parametric trusses with automated export to laser cutting.
Result
Faster production preparation. Fewer export errors.
PDF generation
Challenge
Saving and renaming PDFs manually took time.
Solution
Automated PDF generation to fixed server locations.
Result
Documents are available immediately. No manual filing.